Break the updated workspace vision into a checked-in roadmap from 2.4.0 through 3.1.0 so later implementation can be driven milestone by milestone. Link the roadmap from the vision doc and keep each release slice scoped to one product capability, from the workspace contract pivot through shells, export/diff, services, snapshots, secrets, networking, and GA promotion. This is a docs-only planning scaffold; runtime behavior stays unchanged in this commit.
47 lines
2.1 KiB
Markdown
47 lines
2.1 KiB
Markdown
# Task Workspace GA Roadmap
|
|
|
|
This roadmap turns the agent-workspace vision into release-sized milestones.
|
|
|
|
Current baseline is `2.4.0`:
|
|
|
|
- workspace persistence exists and the public surface is now workspace-first
|
|
- host crossing currently covers create-time seeding and later sync push
|
|
- no shell, export, diff, service, snapshot, reset, or secrets contract exists yet
|
|
|
|
Locked roadmap decisions:
|
|
|
|
- no backward compatibility goal for the current `task_*` naming
|
|
- workspace-first naming lands first, before later features
|
|
- snapshots are real named snapshots, not only reset-to-baseline
|
|
|
|
Every milestone below must update CLI, SDK, and MCP together. Each milestone is
|
|
also expected to update:
|
|
|
|
- `README.md`
|
|
- install/first-run docs
|
|
- `docs/public-contract.md`
|
|
- help text and runnable examples
|
|
- at least one real Firecracker smoke scenario
|
|
|
|
## Milestones
|
|
|
|
1. [`2.4.0` Workspace Contract Pivot](task-workspace-ga/2.4.0-workspace-contract-pivot.md)
|
|
2. [`2.5.0` PTY Shell Sessions](task-workspace-ga/2.5.0-pty-shell-sessions.md)
|
|
3. [`2.6.0` Structured Export And Baseline Diff](task-workspace-ga/2.6.0-structured-export-and-baseline-diff.md)
|
|
4. [`2.7.0` Service Lifecycle And Typed Readiness](task-workspace-ga/2.7.0-service-lifecycle-and-typed-readiness.md)
|
|
5. [`2.8.0` Named Snapshots And Reset](task-workspace-ga/2.8.0-named-snapshots-and-reset.md)
|
|
6. [`2.9.0` Secrets](task-workspace-ga/2.9.0-secrets.md)
|
|
7. [`2.10.0` Network Policy And Host Port Publication](task-workspace-ga/2.10.0-network-policy-and-host-port-publication.md)
|
|
8. [`3.0.0` Stable Workspace Product](task-workspace-ga/3.0.0-stable-workspace-product.md)
|
|
9. [`3.1.0` Secondary Disk Tools](task-workspace-ga/3.1.0-secondary-disk-tools.md)
|
|
|
|
## Definition Of Done For The Roadmap
|
|
|
|
The workspace product is ready to leave beta when:
|
|
|
|
- the public contract is workspace-first rather than task-first
|
|
- an agent can inhabit a sandbox through shell, exec, service, diff, export,
|
|
snapshot, reset, and explicit host-crossing operations
|
|
- the main docs lead with the workspace product, not one-shot VM execution
|
|
- the remaining deliberate deferrals are secondary disk tools rather than core
|
|
workspace features
|